CBMI Construction covers traditional retrofitting, energy conservation and carbon reduction (alternative fuels, calcined clay) and cutting-edge fields Carbon Capture, Utilization and Storage (CCUS), Front End Engineering Design (FEED) and 3D modeling.
We continue to expand and update our network of small European suppliers, carrying out systematic screening to assess their suitability and integration potential for future feasibility studies and project execution. In parallel, we actively pursue diverse forms of collaboration with major CCUS companies.
CBMI Construction collaborated to complete TITAN’s IFESTOS feasibility study, including the associated FEED bidding process.
We continue to refine fuel classifications, supplier databases, and standard specification lists.
In parallel, we completed preliminary selection parameter calculations for eight types of equipment, carried out baseline thermal calculations for drying processes, and established internal quality control standards for Refuse Derived Fuel (RDF) and Solid Recovered Fuel (SRF).
Holcim Go4Zero
Mons, Belgium
4000 t/d
TSR: 95%
Carbon Emission Reduction : 1.1m t/y
CRH K6
Lumbres, France
3500 t/d
TSR: 80% targeted, 92% reached
Carbon Emission Reduction : 860k t/y
Holcim CIZ
Čížkovice, Czech Republic
Carbon Emission Reduction : 100k t/y
TSR : 100%
Lafarge SPL
Saint-Pierre-La-Cour, France
First Calcined Clay Project in Cement in France
Carbon Emission Reduction: 100k t/y
Heidelberg Materials Airvault Separate Grinding Plant
Airvault, France
Carbon Emission Reduction: 1m t/y
CRH K6
Lumbres, France
3500 t/d
TSR: 80% targeted, 92% reached
Carbon Emission Reduction : 860k t/y